Process

plantas, decorativo

Unique
Process

This method minimizes waste, reduces environmental impact and provides better thermal and acoustic insulation. Additionally, the use of mechanical fastening systems and quick-dry mortars speeds up the work, while our choice of certified and environmentally responsible materials promises a sustainable and durable future in the construction sector.

Preparation

This phase involves the initial definition of the project, including preliminary analyses, budgets and planning. This is where the foundations for the project are established.

  • Feasibility analysis
  • Budget and initial planning
  • Establishment of the project's foundations
1

Preparation

Defining the basis for success!

Design

At this stage, the detailed development of the design takes place, including architectural choices, material selection, and spatial planning. It is a crucial phase in determining the appearance and functionality of the project.

  • Development of the architectural concept
  • Selection of materials and definition of layouts
  • Elaboration of detailed plans
2

Design

Defining the basis for success!

Construction

This phase covers the manufacture of the modules and construction on site, with these processes running in parallel, ensuring shorter delivery times so that everything is in accordance with the plan.

  • Manufacturing of modules in a controlled environment
  • Land preparation and execution of foundations
  • Assembly and installation of modules on site
3

Construction

Turning plans into reality!

Conclusion

In the last stage, the final details are implemented. It includes inspections, finishes, and the final delivery of the project. It's the moment to ensure that all specifications have been met and to deliver the completed project to the client.

  • Completion of final finishes
  • Inspections and necessary adjustments
  • Final delivery to the customer
4

Conclusion

Final details, perfect delivery!

Innovation
Projects

Personal or professional, at C2P you will find solutions for all your projects.

Get to know our projects.

Restaurant/Bar furnished movable or fixed

LSF or mixed structure

Mobile and fixed offices

Até 5 pisos em estrutura mista

Event Stands

Contentores ou LSF

Residential Housing

Containers, LSF or mixed structure.

Tourist Housing

Containers or LSF.

Temporary Housing

Containers or LSF.

Prédios de Habitação

LSF or mixed structure.

Building Restoration

LSF or mixed structure.

Tiny houses<

LSF.

Scroll to discover

What's the
difference?

The modular construction of C2P, compared to traditional construction, presents significant advantages. The efficiency in the construction process is enhanced by pre-fabrication in a controlled environment, reducing on-site construction time and weather-related delays.

Design

Get to know our modular homes, explore all the models here.

Explore
QUALITY CONTROL

Quality control in the factory ensures greater precision, resulting in structures that meet rigorous safety and durability standards.

Quality

We ensure quality in modular housing through the rigorous certification of materials. This commitment to quality ensures durable and safe constructions, meeting high standards of performance and sustainability.

We bet on a sustainable, innovative and efficient technology resulting in savings and comfort.

      gitGraph TB:
       commit id: "Budgeting"
       commit id: "Execution of projects"
       commit id: "Land preparation"
       branch factory
       checkout factory
       commit id: "Manufacturing of structures"
       checkout main
       commit id: "Foundations"
       checkout factory
       commit id: "Exterior walls"
       checkout main
       commit id: "Public Network"
       checkout factory
       commit id: "Electric installations"
       commit id: "Water and sewers"
       checkout main
       merge factory id: "Assembly"
       commit id: "Interior Walls"
       commit id: "Furniture and toilets"
       commit id: "Interior finishes"
       commit id: "Inspections and certifications" 

Efficiency in factory production

In the factory we achieve ratios of 70% production above the construction in the worksite (Modular or traditional construction).

Dry Construction Materials

Dry Construction Materials - It is important to explain that the majority of materials do not require drying time, which means it ensures continuity without interruptions.

Simultaneous Construction

When we are carrying out the projects, we will have two fronts of work advancing simultaneously, thus, we gain 3 to 4 months compared to onsite construction.

Latest articles

Model Luz

  • 273,45 m2 Area
  • T3 Typologies
  • From 1.700,00 €/m2 (1) Price 2
2 The VAT rate is added
1 (valid to national territory)
Explore Série Luz, area exterior, piscina opcional

Model Banda

  • 174,00 m2 Area
  • T2 - T3 Typologies
  • From 1.650,00 €/m2 (1) Price 2
2 The VAT rate is added
1 (valid to national territory)
Explore

Model Eixo

  • 142,00 m2 Area
  • T3 Typologies
  • From 1.500,00 €/m2 (1) Price 2
2 The VAT rate is added
1 (valid to national territory)
Explore
Scroll to discover

How
Shall we do it?

Faster and more sustainable.
Get to know our process.

Our process

Check out our solutions for
Maritime containers, LSF and Mixed Structure.
And if you have your custom project in mind
do not hesitate to contact us.